Here it is, folks--the Longtree well, completed at last.
Here it is, folks--the Longtree well, completed at last.

Here it is, folks--the Longtree well, completed at last. Hier Drilling went down 477 feet and hit water pressure of a hundred gallons a minute (we can use only 15 per minute). The pump was inserted and the well was capped. The riser is for immediate water needs.